• 1.jpg
    Traffic Engineering
    At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas molestias excepturi sint occaecati cupiditate non provident...
  • 3.jpg
    Construction Engineering & Inspection
    At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas molestias excepturi sint occaecati cupiditate non provident...
  • 4.jpg
    Highway Design
    At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas molestias excepturi sint occaecati cupiditate non provident...
  • 5.jpg
    Land Development
    At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas molestias excepturi sint occaecati cupiditate non provident...
Our Projects



  • D1 Districtwide Minor Design
  • D1 Districtwide Resurfacing
  • I-95 (SR 9) at Okeechobee Blvd. (SR 704)
  • Kohl's Intersection Design
  • Matheson Avenue
  • Metro Parkway Widening
  • Placida Road Widening Design
  • Polk County Parkway Design
  • SR 595 (Seminole Blvd) at 8th Avenue SE Intersection Roadway Design
  • SR 15 (US 17) Widening and Resurfacing
  • SR 5/US 1 Port St. Lucie, from Port St. Lucie Blvd. To Rio Mar Drive
  • Santa Barbara Widening
  • SR 60A Widening
  • Three Oaks Parkway
  • Western Beltway Widening


Traffic Engineering and Operation Studies
  • Charlotte County Miscellaneous Traffic Engineering Services
  • City of Bonita Springs Miscellaneous Services
  • City of Homestead Miscellaneous Traffic Engineering Services
  • City of Marathon Miscellaneous Traffic Engineering ServicesCity of Miami Beach Miscellaneous Traffic Engineering Services
  • City of Naples Miscellaneous Services
  • City of North Port Miscellaneous Traffic Engineering Services
  • City of Sanibel Miscellaneous Services
  • City of Tampa Miscellaneous Services
  • Collier County Miscellaneous Traffic Engineering Services
  • D-1 District Wide Safety StudiesD-3 District Wide Miscellaneous Traffic Counts and Projections D-6 District Wide Traffic Operations Safety Studies Golden Gate Boulevard Widening Traffic Study
  • Hernando County Miscellaneous Traffic Engineering Services
  • Lee County Miscellaneous Traffic Engineering Services
  • Miami-Dade Miscellaneous Traffic Engineering Services
  • Placida Road Widening Traffic Study
  • Santa Barbara Boulevard Widening Traffic Study
  • SR 30 (US 98) PD&E Study, from east of Santa Rosa Interchange to Emerald SR 10 (US 90) Mahan Drive
  • Turnpike District ITS and Traffic Operations Consultant


Traffic Operations Design
  • I-95 (SR 9) at Okeechobee Blvd. (SR 704)
  • Orlando Western Beltway, Part C, Section 3
  • SR 60A (Van Fleet Drive) from US 17 to SR 60
  • SR 10 (US 90) Mahan Drive
  • SR 7 (US 441) Design and Preparation of Construction Plans
  • SR 5/US 1 Port St. Lucie, from Port St. Lucie Blvd. To Rio Mar Drive


Construction Engineering and Inspection
  • American Concrete Tile CEI Services, Arcadia
  • CEI Services for US 41 (Cortez Rd) @ US 41 Bus. And 44th Ave, & I-75 Bridges
  • CEI Services for CR 832 (Keri Rd), E of SR 29 Hendry County
  • CEI Hybrid Services, Hardee County
  • CEI for US 27 from Ponce De Leon to Hal McRae Boulevard
  • D-1 Districtwide CEI Enhancement
  • D-1 Districtwide Hybrid Inspection
  • D-1 SR 29 & SR 78 CEI Services
  • D-1 Districtwide CEI Support (A)
  • D-1 CEI Services for Consultant Rural Residency
  • SR 8 (I-10) Sneads Weigh Station, Jackson County


Transportation Planning
  • Alligator Alley O&D Study
  • Central Office Traffic & Roadway Data Collection
  • D-1 Statistics - Data Collection and Analysis
  • D-1 Districtwide Federal Functional Classification
  • D-1 Districtwide Systems Planning, Transportation Statistics
  • D-3 Districtwide Misc Traffic Counts and Related Data Gathering Activities
  • D-3 Districtwide Misc Traffic Counts and Related Data Gathering
  • D-3 Districtwide Misc Traffic Data Collection Projects
  • D-4 Districtwide Statistics General Consultant Data Collection and Analysis
  • D-5 Districtwide Data Collection Contract for Planning
  • D-5 Data Collection for Traffic Signal Retiming
  • D-6 Districtwide Public Transportation Consultant Services
  • D-6 Short Range Project Development Management System
  • D-6 Traffic Monitoring Sites Design and Professional Services Consultant
  • D-6 Traffic Monitoring Sites Implementation and Professional Services
  • D-6 Districtwide Data Collection Services
  • D-6 DistrictWide ETDM
  • D-7 Districtwide Data Collection for Signal Retiming
  • D-7 Districtwide Travel Characteristics
  • D-7 Districtwide Planning Statistics Program
  • General Consultant for Traffic and Roadway Data, Transportation Statistics Services
  • High Speed Rail Road Project
  • I-595 Express Lanes Study
  • Statewide Consultant for Traffic and Roadway Data
  • Tampa-Hillsborough County Expressway Authority Data Collection


Signal System
  • Australian Avenue/Congress Avenue and SR 80/Southern Boulevard, Palm Beach County
  • Cocoplum & US 41 Signal Design
  • D-1 Countywide Retiming, Manatee County
  • D-1 Design of Traffic Signal System Retiming
  • D-7 Districtwide Signal Retiming
  • Interstate 95 @ Okeechobee Boulevard (SR 704) Signal and Lighting Design, Palm Beach County
  • I 95 and Okeechobee Blvd. Lighting Design, Palm Beach County
  • Polk County Parkway, Sections 3, 4 and 7 Signal Design
  • Signalization Design Improvements for Florida Gulf Coast University
  • Suncoast Parkway Sections 1 & 2 Signal and Lighting Design, Pinellas County
  • SR 438 Signal Design, Orange County
  • SR 10 Signal Design, Leon County
  • SR 78 and Hancock Bridge Parkway Signal Design, Lee County
  • SR 814 Atlantic Blvd. Signal Design, Palm Beach County
  • US 41 Business Lighting Design, Lee County
  • Winter Haven Signal System
  • Western Beltway, Section 3 Lighting Design


Miscellaneous Services
  • Installation of Permanent Weigh-In-Motion (WIM) Sensors and Collection of Strategic Highway Research Data
  • Regional Geotechnical Studies and Materials Testing (SIDARS)
  • SR 30 (US 98) at 23rd Street Intersection Feasibility Study
  • SR 600 (US 17/92) from SR 555 (US 17) to Ramona Avenue in Lake Alfred PD&E Study